Petroleum & Cement Terminal Access Trestle
Construction of Petroleum and Cement Terminal Access Trestle supported by (22) 48- in steel pipe pile up to 185-ft in length and... Learn More
Carl E. Moses Boat Harbor
Selected by the City of Unalaska to provide design-build services for the construction of the Carl E Moses Boat Harbor to accommodate... Learn More
Christy Lee Platform – Fender Salvage & Reinstallation
The Christy Lee Platform, located along the western shore of Cook Inlet near the Drift River Terminal Facility, experienced catastrophic mechanical failure... Learn More
Unit #1 Mooring and Buoy Installation
Nearly half of the American population lives within 50 miles of coastlines. In 2014, the U.S. Department of Energy (DOE) Wind Program... Learn More
Swan Lake Reservoir Expansion
The Swan Lake Hydroelectric Project is a 22 MW hydroelectric facility with a concrete thin arch dam, intake, tunnel, penstock, and powerhouse... Learn More
Marina Dredge Maintenance – Port of Everett
Pacific Pile & Marine was contracted for dredging of 29,000 cubic yards of sediments in the Port’s Marina in the vicinity of... Learn More
Ammunition Pier Repair – Navy
The Ammunition Pier Piling Replacement consisted of the demolition, removal, and replacement of 24-in dia. hollow and 18-in dia. pre-stressed concrete piles.... Learn More
Chignik Public Dock
Project involved removal and salvage of existing Class “B” armor rock along the existing fill area to modify the existing armor rock... Learn More
Mukilteo Ferry Terminal Phase 1 Tank Farm Demolition and Dredging
PDCA PROJECT OF THE YEAR AWARD – 2017 This work represented the first phase of a multimodal project to relocate the existing... Learn More
Terminal 18 & 46 Removal of Ship-to-Shore Container Cranes
Removal of four undersized ship-to-shore (STS) container cranes from T18 and T46 in the North Harbor. On-site disassembly was performed utilizing the... Learn More