Kingston Timber Pile Removal and Replacement
The Timber Pile Removal and Replacement project involved the removal and replacement of timber at the Kingston Marina. 56 pile were removed... Learn More
Don Morse Park Phase 1 Improvements
The Don Morse Memorial Park is located on the shoreline of Lake Chelan, just above the Lake Chelan Dam in the town of Chelan.... Learn More
Railroad Floating Dock – Cruise Ship
Retrofitted 230-ft x 60-ft barge for a floating extension to a cruise ship berth. Involved construction of new and retrofitted dolphins, barge... Learn More
Hydaburg Small Boat Harbor Renovation
Demolition and removal of existing floating docks and utilities and installation of new in kind. Portions of the existing electric utilities were... Learn More
Ivar’s Pier 54 Piling and Apron Replacement
ENR AWARD OF MERIT PROJECT Seattle waterfront is home to a number of iconic landmarks including the Ivar’s, Inc. seafood restaurant at... Learn More
Pier 62/63 Rebuild Phase 1 – Habitat and Alaskan Way Improvements
PDCA PROJECT OF THE YEAR AWARD – 2020 Pier 62/63 in Seattle, Wash. is the former site of the annual “Summer Nights... Learn More
Oil Refinery Augercast Pile
Installation of 14 ea. 24-in dia. x 60-ft depth and 12 ea. 16-in dia. x 55-ft depth reinforced augercast pile.
Yakima River Bridges Cle Elum to Ellensburg
PDCA PROJECT OF THE YEAR AWARD – 2020 This project required the rapid design and construction of two separate temporary bridges,... Learn More
Georgetown WWTS – Outfall
Seattle sewer lines installed in the early- to mid-20th century simply can’t handle the up to 70 million gallons of polluted stormwater that flows... Learn More
Powhatan Wreck Removal
An out of service tugboat, the 81 foot Tug Powhatan sank for unknown reasons from its dock in Starrigavan Bay near Sitka,... Learn More