LNG Canada – Loadout Line Trestle
LNG Canada Development Inc. initiated the project to build a new liquefied natural gas (“LNG”) liquefaction facility and export terminal, initially consisting... Learn More
G Jetty and Jetty 11 Remediation
Department of National Defence (DND) and Contracting Authority Public Services and Procurement Canada (PSPC) required contaminated sediment remediation within the G... Learn More
Canadian Forces Sailing Association Waterlot Remediation Project
Public Services and Procurement Canada (PSPC) required remediation at the Canadian Forces Sailing Association (CFSA) Waterlot. The Project’s focused was to bring... Learn More
Tsawwassen North and South Breakwater Life Extension
The Tsawwassen Ferry Terminal is BC Ferries largest and most environmentally exposed terminal. The North and South breakwaters protect vessels from adverse... Learn More
Terminal 91 Berth 6 and 8 Redevelopment – Port of Seattle
The project will redevelop berths 6 and 8, and provide 750 feet of moorage to ensure the long-term viability of the Port... Learn More
Trigon Pacific Terminal’s Berth 2 Beyond Carbon (B2BC)
Trigon Pacific Terminal’s Berth 2 Beyond Carbon (B2BC) project at its Prince Rupert, B.C., facility will nearly double terminal capacity with a... Learn More
Pier 58 / Seattle Waterfront
The foundation for the new Pier 58 is taking shape along the Seattle waterfront. The project is a piece of the $756... Learn More
Antarctica – Pier at Palmer Station
Construction of the new pier at Palmer Station was completed at the end of April, the first major milestone in modernizing the... Learn More
Lake Washington Dry Docks Removal
Deconstruction of two derelict sunken dry docks in 25-ft of water went beyond the normal vessel salvage. The dry docks had been... Learn More
Vessel Salvage – John Wayne Marina
Emergency response was called for a boat salvage to recover the vessel that had exploded while moored in the marina. A local... Learn More